Our House Build - Progress Update
Lots has happened over the last few days!
The plumbing rough-in is done, the roof sheeting has finished being screwed down properly, the electrical rough in is done, the cavity sliders are fitted, it looks like the laundry door and the door between the house and garage are both in, and it also looks like the insulation has been installed in the walls and ceiling.
The roof line looks so crisp without the scaffold in the way. There are also temporary downpipes in place.
Apparently plastering is starting on Monday. Things are flying along now!