Here's a render of the powder room, sans toilet roll holder.
We've signed our colour selection papers today (at last!)
Good to have that part over and done with.
We're upgrading the solar hot water system from Rinnai's 1XL system (standard with our builder) to their system 4 (suits our household requirements with the two baths, three showerheads etc a bit better)
We're also putting acoustic batts in the walls between the bathroom and bed 4, all internal walls of the theatre, and in the two walls between the master bedroom and the living area/entry way. The other two bedrooms are separated acoustically by their built in robes.
No comments:
Post a Comment